Bridge Installation at Zane State Cambridge

 Those traveling State Route 660/Brick Church Road in Cambridge will see delays. 

The road closed Thursday morning for installation of the pedestrian bridge that will span the road enabling Zane State students to travel between the two buildings of the Cambridge campus. 

A spokesman for the college said a majority of the delays will come Friday as the section spanning the roadway is set in place.

Categories: Local News